Westinghouse 7879965 Installation Guide Page 5

  • Download
  • Add to my manuals
  • Print
  • Page
    / 12
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 4
10
UL-ES-Bethany-WH09
9
Loosen downrod ball (1) from downrod (2) by removing set screw (3).
Afloje la esfera de la varilla vertical (1) de la varilla vertical (2)
quitando el tornillo (3).
2
3
1
EXTENDED DOWNROD OPTION
OPCIÓN CON VARILLA
VERTICAL MÁS LARGA
NORMAL DOWNROD OPTION
OPCIÓN CON VARILLA VERTICAL
PARA CIELORRASO NORMAL
8
2
1
3
Feed motor lead wires through downrod/canopy assembly and insert downrod into downrod yoke.
Make sure to align hole in downrod with the hole in downrod yoke. Install yoke cross pin (1) through
yoke and downrod. Insert clamp pin (2) into cross pin until it snaps into place. Tighten set screws (3)
in yoke. PROCEED TO PAGE 13, STEP 13.
Pase los hilos conductores del motor a través de la varilla vertical/conjunto del dosel e inserte la
varilla vertical en la horquilla de la misma. Aserese de que el orificio de la varilla vertical y el de
la horquilla de la varilla vertical esn alineados. Instale el pasador transversal de la horquilla (1)
pandolo por la horquilla y la varilla vertical. Inserte el pasador de fijacn (2) en el pasador
transversal hasta que escuche un chasquido que indique que es en la posicn adecuada. Ajuste los
tornillos de fijacn (3) en la horquilla. PROCEDA A LAG. 13, PASO 13
Page view 4
1 2 3 4 5 6 7 8 9 10 11 12

Comments to this Manuals

No comments