Westinghouse WBRCNG140F Installation Manual Page 27

  • Download
  • Add to my manuals
  • Print
  • Page
    / 73
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 26
27
WHL-015 REV. 12.17.14
Figure 14 Gas Line with Shut-Off Valve Detail
Figure 15 Natural Gas Piping Installation NOTE: Capacity to be Not Less than Total Capacity of Connected Appliances
Figure 16 LP Gas Piping Installation NOTE: Capacity to be Not Less than Total Capacity of Connected Appliances
PART 8 WATER PIPING
A. GENERAL PLUMBING CONNECTION GUIDELINES
Pipe material must be suitable to meet local codes and industry standards.
The pipe must be cleaned and without blemish before any connections are made.
Do not apply a torch within 12” of the appliance. Doing so could damage the appliance. Such damages ARE NOT covered by
product warranty.
The size of the hot water pipe should be ¾” diameter and the central heating water pipe should be 1” in diameter.
To ease future maintenance isolation valves are recommended on both the CH and DHW loops.
All piping should be insulated.
Page view 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 72 73

Comments to this Manuals

No comments